Footing Dug for Stem Wall and House Survey Stakes Set

November 26, 2024 by ckmc

Footing for the foundation stem wall has now been dug and lot has been surveyed for house. Next up is forming the footing walls near the pool and garage areas and adding the rebar for inspection. Goal is to have footing walls and rebar in by early to mid-next week with a call for inspection by the end of the week. If all goes well (does it ever?) then it may be possible to pour by end of week or first of the following week. Once poured the new stem wall can be built which is also scheduled for the week of the pour.

Resized_20241121_093652_1732644920103
Resized_20241121_093451_1732644874878
Resized_20241121_093524_1732645295257
previous arrow
next arrow

Filed Under: Povinelli Home Build

Backfilling and Creating Upper-level Pad

November 11, 2024 by ckmc

The last two weeks have been spent finishing walls and bringing in truckloads (and truckloads and truckloads) of dirt for filling the pool area and for house foundation pad. This had to take place before the font of house foundation footing could be dug and font stem wall built. Still waiting on final survey before the front wall (over 120 feet of wall) can be built. Materials for front wall footing are on site. New dirt had to be trucked in for foundation as existing dirt did not pass compaction testing. Existing dirt was used as fill dirt for backfilling walls.

Resized_20241111_093551_1731365747720
Resized_1000002332_1731365758671
Resized_1000002324_1731365784517
Resized_1000002322_1731365793229
previous arrow
next arrow

Filed Under: Povinelli Home Build

Finishing Excavation for House Pad

September 28, 2024 by ckmc

Excavation for house pad should be complete by end of weekend or by early next week at the latest. Request for surveyors has been made which -depending on the surveyor’s schedule- should be completed by the end of next week or early the following week. Once surveyed, the house footings can be dug, foundation can be formed, and plumbing can be added. This should take around two weeks. Once foundation is formed and plumbing is complete, the foundation can be inspected. Once the foundation passes inspection the pad can be poured (one day) and construction on the house can begin. With this schedule -and no unforeseen delays- framing the house should begin towards the end of October on early November.

Resized_20240927_093559_1727485857349
Resized_20240927_093429_1727485922344
Resized_20240927_093347_1727485946580
Resized_20240926_154720_1727486021283
previous arrow
next arrow

Filed Under: Povinelli Home Build

Pour and Build

August 24, 2024 by ckmc

As per the schedule set out in the last post, the rebar for the footing and inspection was completed last week and the pour and second upper wall were completed this week. Excavation is next to be scheduled to prep for the house foundation.

Resized_20240824_150338_1724539455491
Resized_1000002117_1724539511346
Resized_1000002131_1724539493704
Resized_1000002142_1724539467576
previous arrow
next arrow

Filed Under: Povinelli Home Build

Ready for New Walls

August 12, 2024 by ckmc

Rebar for second walls will be completed for inspection this week and possibly pour. Heat (average 108) and rocks (average very hard) certainaly slowed the process. However, all footings are now ready for inspection. If not poured this week than early next week. Building of second walls will start by mid to end of next week and should be completed within a week of starting.

Resized_20240808_140621_1723470373287
Resized_20240808_140633_1723470351598
Resized_20240809_133917_1723470398073
previous arrow
next arrow

Filed Under: Povinelli Home Build

These Were Serious Rocks

July 14, 2024 by ckmc

These were some serious rocks to be removed before the next wall could be built. A special, larger cat had to be brought in to do the job. What should have taken a day took almost a week. But, the worst is over and the next wall is just about ready to be built.

Resized_20240709_133233_1721000550941
Resized_20240709_133252_1721000418932
Resized_20240710_110418_1721000595819
previous arrow
next arrow

Filed Under: Povinelli Home Build

Blockfill, Backfill and More Blocks

June 21, 2024 by ckmc

Back wall has been filled with concrete on schedule. Back wall has been backfilled with dirt on schedule. New grading is underway as per schedule. Next wall should start this next week after surveyors confirm locations and elevations. Blocks are sitting patiently awaiting their moment to have purpose.

Resized_20240619_095512_1718995358565
Resized_20240617_073405_1718995433908
Resized_20240617_073528_1718995413284
Resized_20240617_082118_1718995392275
previous arrow
next arrow

Filed Under: Povinelli Home Build

Back Wall Poured and Sealed

June 9, 2024 by ckmc

The upper back wall was poured at the beginning of the week and was then sealed at the end of the week. Once this wall has been backfilled, and once excavation for the second wall is completed (over the next week or so) then work on the second back wall can start.

concrete-pour
Resized_1000001993_1717965182429
Resized_20240607_105209_1717965153346
previous arrow
next arrow

Filed Under: Povinelli Home Build

  • « Go to Previous Page
  • Page 1
  • Page 2
  • Page 3
  • Page 4
  • Go to Next Page »

Primary Sidebar

blog archive

  • April 2025 (2)
  • March 2025 (1)
  • February 2025 (2)
  • January 2025 (1)
  • December 2024 (2)
  • November 2024 (2)
  • September 2024 (1)
  • August 2024 (2)
  • July 2024 (1)
  • June 2024 (3)
  • May 2024 (3)
  • April 2024 (1)
  • March 2024 (4)
  • February 2024 (1)
  • January 2024 (3)
  • December 2023 (3)

Copyright 2023 - GMK Building and Development LLC