Laying Block

March 2, 2024 by ckmc

After overcoming a few subcontactor issues, laying block has started.

Resized_20240301_122017_1709341201094
Resized_20240301_122201_1709341555711
Resized_20240301_122231_1709341263926
previous arrow
next arrow

Filed Under: Povinelli Home Build

Pouring Concrete – Building Walls

February 22, 2024 by ckmc

After overcoming a number of obstacles, wall construction has started.

Resized_20240221_150913_1708609288683-1
Resized_20240221_120426_1708609353675-1
Resized_20240221_084139_1708609233253-1
previous arrow
next arrow

Filed Under: Povinelli Home Build

Ready for pour on Wednesday

January 6, 2024 by ckmc

Footings are ready for the pour which should happen sometime this week (01.08.24)

Filed Under: Povinelli Home Build

Laying steel

January 3, 2024 by ckmc

Today the subs started laying the steel for the footings.

Filed Under: Povinelli Home Build

Footings prepped

January 2, 2024 by ckmc

Footing have now been prepared for steel and concrete by subs. Steel is being dropped the first week of January 2024.

Filed Under: Povinelli Home Build

Footing and block bids

December 21, 2023 by ckmc

The holidays have slowed things down considerably, but we’re finally, after having multiple (4-5) subs visit the site, getting bids for the footing and walls. Pouring the footings and building the walls for this project is a challenge for sure and this has no doubt caused a delay in getting the bids. However, two subs are submitting bids this week and have both commited to starting the first week of January 2024.

Filed Under: Povinelli Home Build

Rendering

December 6, 2023 by ckmc

Filed Under: Povinelli Home Build

Concept

December 6, 2023 by ckmc

Filed Under: Povinelli Home Build

  • « Go to Previous Page
  • Page 1
  • Page 2
  • Page 3
  • Page 4

Copyright 2023 - GMK Building and Development LLC