After overcoming a few subcontactor issues, laying block has started.
Pouring Concrete – Building Walls
After overcoming a number of obstacles, wall construction has started.
Ready for pour on Wednesday
Footings are ready for the pour which should happen sometime this week (01.08.24)
Laying steel
Today the subs started laying the steel for the footings.
Footings prepped
Footing have now been prepared for steel and concrete by subs. Steel is being dropped the first week of January 2024.
Footing and block bids
The holidays have slowed things down considerably, but we’re finally, after having multiple (4-5) subs visit the site, getting bids for the footing and walls. Pouring the footings and building the walls for this project is a challenge for sure and this has no doubt caused a delay in getting the bids. However, two subs are submitting bids this week and have both commited to starting the first week of January 2024.