Pour and Build

August 24, 2024 by ckmc

As per the schedule set out in the last post, the rebar for the footing and inspection was completed last week and the pour and second upper wall were completed this week. Excavation is next to be scheduled to prep for the house foundation.

Resized_20240824_150338_1724539455491
Resized_1000002117_1724539511346
Resized_1000002131_1724539493704
Resized_1000002142_1724539467576
previous arrow
next arrow

Filed Under: Povinelli Home Build

Ready for New Walls

August 12, 2024 by ckmc

Rebar for second walls will be completed for inspection this week and possibly pour. Heat (average 108) and rocks (average very hard) certainaly slowed the process. However, all footings are now ready for inspection. If not poured this week than early next week. Building of second walls will start by mid to end of next week and should be completed within a week of starting.

Resized_20240808_140621_1723470373287
Resized_20240808_140633_1723470351598
Resized_20240809_133917_1723470398073
previous arrow
next arrow

Filed Under: Povinelli Home Build

Copyright 2023 - GMK Building and Development LLC