As per the schedule set out in the last post, the rebar for the footing and inspection was completed last week and the pour and second upper wall were completed this week. Excavation is next to be scheduled to prep for the house foundation.
Archives for August 2024
Ready for New Walls
Rebar for second walls will be completed for inspection this week and possibly pour. Heat (average 108) and rocks (average very hard) certainaly slowed the process. However, all footings are now ready for inspection. If not poured this week than early next week. Building of second walls will start by mid to end of next week and should be completed within a week of starting.