Back Wall Passed – to be Poured on Monday

June 3, 2024 by ckmc

Back wall passed inspection this week and is scheduled to be poured on Monday. Excavators prepared the ground for the pool wall this week. More excavation scheduled for this week to prepare for second back wall and pool wall.