Back wall has been filled with concrete on schedule. Back wall has been backfilled with dirt on schedule. New grading is underway as per schedule. Next wall should start this next week after surveyors confirm locations and elevations. Blocks are sitting patiently awaiting their moment to have purpose.
Archives for June 2024
Back Wall Poured and Sealed
The upper back wall was poured at the beginning of the week and was then sealed at the end of the week. Once this wall has been backfilled, and once excavation for the second wall is completed (over the next week or so) then work on the second back wall can start.
Back Wall Passed – to be Poured on Monday
Back wall passed inspection this week and is scheduled to be poured on Monday. Excavators prepared the ground for the pool wall this week. More excavation scheduled for this week to prepare for second back wall and pool wall.