Blockfill, Backfill and More Blocks

June 21, 2024 by ckmc

Back wall has been filled with concrete on schedule. Back wall has been backfilled with dirt on schedule. New grading is underway as per schedule. Next wall should start this next week after surveyors confirm locations and elevations. Blocks are sitting patiently awaiting their moment to have purpose.

Resized_20240619_095512_1718995358565
Resized_20240617_073405_1718995433908
Resized_20240617_073528_1718995413284
Resized_20240617_082118_1718995392275
previous arrow
next arrow

Filed Under: Povinelli Home Build

Back Wall Poured and Sealed

June 9, 2024 by ckmc

The upper back wall was poured at the beginning of the week and was then sealed at the end of the week. Once this wall has been backfilled, and once excavation for the second wall is completed (over the next week or so) then work on the second back wall can start.

concrete-pour
Resized_1000001993_1717965182429
Resized_20240607_105209_1717965153346
previous arrow
next arrow

Filed Under: Povinelli Home Build

Back Wall Passed – to be Poured on Monday

June 3, 2024 by ckmc

Back wall passed inspection this week and is scheduled to be poured on Monday. Excavators prepared the ground for the pool wall this week. More excavation scheduled for this week to prepare for second back wall and pool wall.

Resized_20240529_093219_1717375522945
Resized_20240529_093125_1717375554541
Resized_20240528_113253_1717375411257
previous arrow
next arrow

Filed Under: Povinelli Home Build

Copyright 2023 - GMK Building and Development LLC